Power sets the pace
On a data center, the electrical work decides when the building can open. We plan conduit routes and service connections before the first footing is poured.
Data centers run on power and stand on concrete. We build both.
Ironhive is a data center construction team in the San Francisco Bay Area. We bring power and fiber into the building, pour the footings and slabs, and raise the walls and roof, working alongside the owners, designers and general contractors who lead each project.
On a data center, the electrical work decides when the building can open. We plan conduit routes and service connections before the first footing is poured.
Inspections, tests and paperwork move with the work, so owners know exactly what was built and how it was checked.
Switchgear, generators and fuel cells each need their own foundations, anchors and connections. We build those details into the structure from the start.
Factory-made walls and roof members arrive ready to set, so the building closes in sooner and the work inside can start earlier.
SV11 went up beside three working Equinix data centers. Building next to live sites takes careful sequencing and clear communication.
Data centers bring together owners, designers, general contractors and specialty trades. We fit in quickly and keep communication simple.
Our work comes in three parts, and each one has been proven on a Bay Area data center.
Underground utilities, conduit, and the power and fiber connections that bring a new building to life.
San Jose · OaklandElectrical supply at Equinix SV11; underground utilities, power and fiber for Comcast
Footings, foundations and slabs built to carry heavy equipment, with walls, floors and finishes completed on top.
250 psfslab load capacity at Equinix SV11, as published by Equinix
Precast prestressed walls and double-tee roofs, cast in a factory and set on site so a building closes in fast.
7,500 sq ftnew Comcast data center in Oakland, 2025–2026
We keep our project list short and exact. Each project below names the owner, the project team and the work our team did. See the projects.
Both projects are in the Bay Area, close to the people and networks they serve. Sites are tight, seismic standards are strict and neighbors are close, so careful work matters.
A two-story data center in San Jose, built of precast concrete on a steel frame, on an Equinix campus planned to run primarily on fuel cells.
Sources: Equinix, June 2021, Equinix SV11 specifications and SK ecoplant, October 2020. Our scope and dates come from our team’s records.
In Oakland, our work began below grade with utilities, power and fiber, and finished at the top with a precast double-tee roof. We call that working from ground to roof.
We like owning a clear piece of the job and finishing it well. Below grade, that means utilities placed right the first time. Above it, walls and a roof that close the building in.
The care is the same at every scale, from a 7,500-square-foot data center in Oakland to a two-story facility on Equinix’s Great Oaks campus in San Jose.
A new data center building of about 7,500 square feet in Oakland, built with precast prestressed walls and a double-tee roof.
Source: our team’s project records.
Our team starts on SV11 in San Jose, bringing electrical supply to the new building and building its footings, foundations and slabs.
SK Engineering & Construction announces a 6.4 MW fuel-cell project for Equinix in San Jose, stacking Bloom fuel cells on several levels to save space.
Source: SK ecoplant, October 20, 2020
SK reports fuel-cell construction starting in April 2021, with about eight months of work planned.
Source: SK ecoplant, October 2020
Equinix announces its $142 million SV11 data center, set to open on June 30, 2021, with room for 2,950 cabinets at full build.
Source: Equinix, June 2, 2021
Our team’s work at SV11 concludes. The building stands on Equinix’s Great Oaks campus beside SV1, SV5 and SV10.
Work begins on a new Comcast data center in Oakland, starting below grade with underground utilities, power and fiber.
Our work on the 7,500-square-foot building runs through September 2026, from footings and slab to precast prestressed walls and a double-tee roof.
Explore further.
We work with owners, developers and general contractors on power, foundations and structure.
SV11 facility details are published by Equinix. Comcast details come from our team’s records.